Heritage Way diversion in Darley Abbey

With the closure of the Darley Abbey Mills pedestrian and cycle bridge for safety reasons, it is no longer possible to follow the Heritage Way route through Darley Abbey village.

Instead, it is necessary to follow a diversion using the east bank of the Derwent and to make use of Handyside Bridge (near to Chester Green) to pass over the river. The diversion route can be seen on the map.

From the north, follow the standard route until reaching Haslams Lane to the east of Darley Abbey Mills. At this point, do not take the westerly route through the Mills and over the (closed) bridge. Instead proceed directly south on Folly Road and then into Darley Fields park. Just before reaching the Darley Fields car park, changing rooms and toilets, take the right turn to reach the riverside and then proceed southwards alongside the river before reaching Handyside Bridge. Cross the bridge and use the steps immediately on the left to regain the normal route into Derby and onwards.

From the south, it is necessary to be vigilant to avoid traveling too far north on the west bank of the river and having to backtrack. It is necessary to cross the river at Handyside Bridge (an old railway bridge close to Chester Green). If you follow the normal Heritage Way route and reach the rowing clubs by the river then you’ve gone too far. After crossing Handyside Bridge follow the riverside northwards through Darley Fields before eventually reaching Folly Road. Proceed along Folly Road to Haslams Lane where you rejoin the normal route.

Unfortunately, the diversion means that walkers miss the attractions of Darley Abbey village including the Abbey Inn and Little Darleys pub. There are other cafes, restaurants and wine bars on the east bank of the river within Darley Abbey Mills and walkers may choose to make a short diversion westwards along Haslams Lane. These include:

Derby City Council are investihttps://www.derby.gov.uk/news/2026/february/permanent-river-crossing-at-darley-abbey-moves-a-step-closer/gating the way forward for the pedestrian and cycle bridge but, as of early January 2026, there are no details of when access across the river at Darley Abbey will again be possible.

Similar Posts

  • New DfT Study on the Benefits of Cycling

    The Department for Transport have published a new study examining the various different benefits that cycling can provide. The review found that existing methods of appraisal do not incorporate the full extent of economic benefits associated with cycling. The review found these potential benefits: economic growth can result from high density, cycle friendly urban design…

  • A Fiver for Wyver

    The Derwent Valley Cycleway will be a multi-user, off-road path from Derby centre all the way up the Derwent valley to Chatsworth. Just north of Belper, the cycleway route goes along the beautiful (but seriously pot-holed!) Wyver Lane. The Derwent Valley Trust are aiming to re-surface the Wyver Lane section of the cycleway this autumn….

  • Black Bag Friday Continues…

    The local community group Paddle Peak have been out again recently continuing in their quest to remove all of last year’s flood debris left strewn down the banks of the River Derwent from Darley Dale downstream. Hundreds of hay bales were washed into the river, leaving thousands of meters of black plastic and other items…

  • Darley Abbey bridge open

    The bridge across the Derwent from Darley Abbey to Darley Abbey Mills was suddenly closed earlier in the year when safety issues were identified. After a lot of confusion as to who was responsible for the bridge, Derby City Council undertook to provide a temporary replacement. This temporary bridge (planned for 12 months usage) has…